HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
HIP Sprinkler: Modification of HVAC equipment and ductwork to accommodate sprinkler upgrades as per plans. No change to use, egress or occupancy.
Proposed removal and replacement of (2) DHW heaters and associated recirculation pumps, with connection of new gas piping with RTUs, DHWs and existing boilers. All as per plans filed herewith. No chan...
Boiler replacement filed in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Installation of ductwork, diffusers, grilles, dampers, insulation, supports, access doors, control wiring and controls for all new equipment specified. New HVAC as specified which includes but not lim...
Modification to existing mechanical system to include hvac replacement and replacement of associated ductwork for tenant (bar soleil). no change to use, egress or occupancy.
HIP Sprinkler: Modification of HVAC equipment and ductwork to accommodate sprinkler upgrades as per plans. No change to use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing mechanical system to include hvac replacement and replacement of associated ductwork for tenant (bar soleil). no change to use, egress or occupancy.
Installation of ductwork, diffusers, grilles, dampers, insulation, supports, access doors, control wiring and controls for all new equipment specified. New HVAC as specified which includes but not lim...
Proposed removal and replacement of (2) DHW heaters and associated recirculation pumps, with connection of new gas piping with RTUs, DHWs and existing boilers. All as per plans filed herewith. No chan...
Boiler replacement filed in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,044 sq.ft. Lobby space. No change of use, egress, or occupancy.
Scope of work includes installation of new HVAC systems per modifications for renovation of roughly 4,360 sq.ft. Lobby space. No change of use, egress, or occupancy.
Modifications to the existing HVAC system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Modifications and minor interior demolition of the existing HVAC system, including removals of ducts and piping on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Hvac work as shown on plans submitted herewith. no change to use, egrees, or occupancy as of right.