HVAC Permits in Manhattan, New York
1,062 hvac permits filed recently
1,062 permits
Modifications to the existing HVAC system on the 1st floor (Landlord Work) as per plans. No change to use, egress or occupancy.
Alteration to existing HVAC systems and equipment including modifications to piping, control devices, and full distribution of ductwork; and installation of new HVAC cooling and heating equipment and...
Filing to register two Federal Boilers with Related Dual Fuel Burners under this BIN#1091056 with location 605-607 West 116th Street, NYC NY 10027 which was approved under #101928853. No work to be do...
Nycha east river boilers consisting of mechanical work as per plans filed herewith. no change to use, egress, or occupancy.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical modifications to include hvac installation and associated duct work. no change to use, occupancy or egress
Installation of a new HVAC system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
Alteration to existing HVAC systems and equipment including modifications to piping, control devices, and full distribution of ductwork; and installation of new HVAC cooling and heating equipment and...
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical modifications to include hvac installation and associated duct work. no change to use, occupancy or egress
The Unitary air conditioning system will be replaced with a VRF air conditioning system, and new ERV units will be installed to provide ventilation.
Filing to register two Federal Boilers with Related Dual Fuel Burners under this BIN#1091056 with location 605-607 West 116th Street, NYC NY 10027 which was approved under #101928853. No work to be do...
Installation of a new HVAC system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 1st floor (Landlord Work) as per plans. No change to use, egress or occupancy.
Alteration to existing HVAC systems and equipment including modifications to piping, control devices, and full distribution of ductwork; and installation of new HVAC cooling and heating equipment and...
Interior renovation of existing dwelling unit (apt#4c) on the 4th floor. work includes removal/installation of non-load-bearing partitions, misc. carpentry, and replace hvac unit as per plans herewith...
Replacement of (5) existing HVAC units for First Floor Store.
Heating Plant Upgrade. No change to use, egress or occupancy.
Hvac system and ventilation installation for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy.
Interior renovation of existing dwelling unit (apt#4c) on the 4th floor. work includes removal/installation of non-load-bearing partitions, misc. carpentry, and replace hvac unit as per plans herewith...