Hvac and exhaust system modification as per plans filed herewith. there is no change of use, egress and occupancy.
Install new gas-fired furnace as per plans. install new dehumidifier and fresh air ductwork to mechanical room. remove existing gas-fired boiler. install new chimney liner in existing masonry chimney...
Installation of a new HVAC system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Two new boilers and two new hot water heaters with associated ducts and piping.
Modifications to the existing HVAC system on the 27th floor as per plans. No change to use, egress or occupancy.
Replacement of split system air conditioning unit. All existing ductwork to remain. No change in use egress and occupancy.
Connect to existing gas piping for new gas-fired furnace as per plans. remove existing gas-fired boiler. no change in use, egress or occupancy.
RENOVATION OF EXISTING OFFICE SPACE 1902 & 1903. INSTALL Installation of HVAC unit. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Replacement (1) new combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
Installation of new boiler filed in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Hvac and exhaust system modification as per plans filed herewith. there is no change of use, egress and occupancy.
Two new boilers and two new hot water heaters with associated ducts and piping.
Installation of new boiler filed in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Replacement (1) new combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
RENOVATION OF EXISTING OFFICE SPACE 1902 & 1903. INSTALL Installation of HVAC unit. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Modifications to the existing HVAC system on the 27th floor as per plans. No change to use, egress or occupancy.
Installation of a new HVAC system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Replacement of split system air conditioning unit. All existing ductwork to remain. No change in use egress and occupancy.
Install replacement fuel storage tank as per plans. remove existing fuel storage tank. no change in use, egress or occupancy.
Connect to existing gas piping for new gas-fired furnace as per plans. remove existing gas-fired boiler. no change in use, egress or occupancy.