HVAC Permits in Manhattan, New York
1,062 hvac permits filed recently
1,062 permits
Replacement of 18 ton hvac system on floor 001. no change to egress, use, or occupancy.
Fuel storage tank installation in conjunction with emergency generator.
Installation of new HVAC system including condensing unit, air handles, ductwork and fans as per plans filed herewith. No change to use, egress or occupancy.
Hereby filing Supplemental support for tenants HVAC equipment for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of new boiler filed in conjunction with renovation of 5-story nycha multiple dwelling throughout; no change to use, egress or occupancy.
Installation of new boiler filed in conjunction with renovation of 5-story nycha multiple dwelling throughout; no change to use, egress or occupancy.
Replacement of 18 ton hvac system on floor 001. no change to egress, use, or occupancy.
Hereby filing Supplemental support for tenants HVAC equipment for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Replacing three fuel oil tanks with two fuel oil tanks.
Fuel storage tank installation in conjunction with emergency generator.
Lehman village boiler upgrades, plumbing modifications as per plans. no change in use egress or occupancy.
Ps 128m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems throughout the building and all apartments, including heating and cooling units, associated condensers, mechanical e...
Chapel & sacristy - modification of hvac and installation of air handler.
Connect to existing gas piping for replacement boiler and gas burner as per plans. no change in use, egress or occupancy.
Structural work filed for ceiling repairs and boiler room ceiling support as per plans filed. no change in use, egress or occupancy.
Hvac modifications for 15th floor commercial space as per plans filed herewith
Modifications of existing mechanical systems to include hvac installation and associated piping. no change to use, occupancy or egress
Modification to existing HVAC systems on 10th (14th M) & 11th (15 M) floors. No change in use, egress or occupancy.
Installation of Fuel Storage tanks for a diesel-based emergency generator.