HVAC Permits in Manhattan, New York
1,062 hvac permits filed recently
1,062 permits
Boiler replacement filed in conjunction with renovation of 6-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Relocation and redistribution of existing HVAC and bathroom exhaust systems as per plans filed herewith. No change in use, egress, or occupancy.
Application filed to replace existing hvac equipment as per plans filed herewith.no change in existing ductwork or air terminals.
Record filing for removal of the existing oil burners, boiler, fuel oil tank, and the associated oil tank enclosure, as shown on the drawings filed herewith, and to withdraw DOB application 102700098....
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Modifications to existing HVAC system and related piping, including installation of WSHP & CRAC units. No change in use, egress or occupancy.
Gas connection to replacement gas boilers.
Modifications to the existing HVAC system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Modifications to building HVAC system on floors 27-29 (Construction designation) / 30-32 (Marketing designation)
Herewith filing plumbing modifications for boiler replacement. No change in use, egress, or occupancy.
Modifications to existing HVAC system & related piping. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Plumbing related work in conjunction with Boiler Replacement. Installation of new hot water boiler/heaters, new gas service lines and plumbing components.
General Construction & Mechanical related work in conjunction with Boiler Replacement. Modification to existing tank room to accommodate installation of new hot water heaters and new chimney steel lin...
Modifications to existing HVAC system and related piping, including installation of WSHP & CRAC units. No change in use, egress or occupancy.
Modifications to existing HVAC system & related piping. No change in use, egress or occupancy.
Gas connection to replacement gas boilers.
Modifications to building HVAC system on floors 27-29 (Construction designation) / 30-32 (Marketing designation)
Modifications to the existing HVAC system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Herewith filing plumbing modifications for boiler replacement. No change in use, egress, or occupancy.