Plumbing work associated with installation of 2 boilers and indirect water heater. no change to use, occupancy, or egress.
Proposed mechanical work associated with the gc job. install ductless mini split air conditioning units. no change to use, occupancy or egress.
Installation of new boiler system as per plans and decommision of existing boiler (67841-03)
Proposing to renovate & expand tenant space - remove & install new walls, Partitions, ceiling/flooring finishes, casework, equipment, wall treatment, replace existing storefront, install new exterior...
Modifications to the existing HVAC system on the 6th floor as per plans. No change to use, egress or occupancy.
installation of construction fence around temp boiler and oil tank
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
Removal of existing 275gal fuel oil tank, installation of a new 275gal fuel oil tank connected to existing emergency generator at shepard hall, and installation of 275gal temporary tank for existing g...
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.
SP: Remove and replace all sprinkler heads associated with the installation of new HVAC work. Note: this application is filed to separate the plumbing & sprinkler filings and to supersede the original...
Removal of existing 275gal fuel oil tank, installation of a new 275gal fuel oil tank connected to existing emergency generator at shepard hall, and installation of 275gal temporary tank for existing g...
Modifications to the existing HVAC system on the 6th floor as per plans. No change to use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.