HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Remove existing computer room air conditioning unit, condensate pump, drip pan, and all supports.remove existing chilled water heat exchanger, pumps, expansion tank, air separator, and chemical feeder...
The scope of work re-using the existing hvac system and re-balance all the existing air terminals for the space. no change in use, egress or occupancy.
Subsequent MS application for installation of HVAC units and associated mechanical equipment as per plans submitted.
HVAC modifications and associated ductwork and related finishes (Public Areas - Sheraton) as per plans. There will be no change in use, egress, or occupancy.
Replace three ton split air conditioning system.
New ductwork and other components for existing HVAC system on the 2-3 floors in conjunction with Alt # M01317652 as per plans filed
Proposed filing for Boiler Replacement.
The scope of work re-using the existing hvac system and re-balance all the existing air terminals for the space. no change in use, egress or occupancy.
HVAC modifications and associated ductwork and related finishes (Public Areas - Sheraton) as per plans. There will be no change in use, egress, or occupancy.
Remove existing computer room air conditioning unit, condensate pump, drip pan, and all supports.remove existing chilled water heat exchanger, pumps, expansion tank, air separator, and chemical feeder...
Installation of one (1) new gas boiler. all work as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work related to boiler replacement. no change in use, egress, or occupancy.
Install split system air conditioning units.
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.
Modification to HVAC system as per plans filed herewith.
Proposed interior renovation for a nail spa and installation of nail ventilation system and air conditioner system in unit#601,#603 on the sixth floor as per plan. no change in use, egress oroccupancy...
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 31st - 33rd Floors, as per plans. No change to use, egress, or occupancy.
Plumbing for new boiler and water heater in cellar