1,126 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,126 permits
Remove sign and structure from wall. No change of use, egress or occupancy
Modification to existing mechanical system to include hvac replacement and replacement of associated ductwork for tenant (bar soleil). no change to use, egress or occupancy.
Erect an non-illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
Interior renovation to apartment #5d on 5th floor of existing building, all as per plan. no change in egress, use or occupancy under this application.
Renovation of commercial retail space (BAR SOLEIL). Installation of non-bearing partitions, new lighting, finishes and millwork. No change to occupancy, use or egress. Removal of e…
Installation of new supply diffusers and return grilles, new ductwork to connect to existing ductwork as required, ductwork insulation as required, and relocation of existing therm…
Construct, secure, and maintain wood framed construction fence for duration of construction. No change to use, egress or occupancy.
Illuminated non-advertising accessory sign on existing marquee approved under nyc landmark preservation commission docket# 26-08191 - timber lobby. no change of use, egress or occu…
Illuminated non-advertising accessory sign on existing marquee approved under nyc landmark preservation commission docket# 26-08191 - hudson lobby. no change of use, egress or occu…
Interior demolition on the 1st floor (former Maker Studio Eat and Beats) as indicated on drawings.
Alt- 2 application is for the interior, non-structural renovation of floor apartment per plans submitted herewith change to use, egress, or occupancy of building, due to proposed w…
Facade repairs. no change in use, egress, or occupancy.
To file interior demolition work at apartment 3N in conjunction with DOB Now Build application job#M01333003. No change in use, egress or occupancy under this application.
Interior renovation of an existing building at apartment 3N. No change in use, egress or occupancy under this application.
The project includes the following heating, ventilation, and air conditioning scope of work
Replacement of horizontal gas piping in the cellar and relocation of the master gas meter, for domestic use only. all existing gas risers (located from cellar to penthouse) are to…
Plumbing work associated with Alt-CO to partially convert existing office building to residential use.
Removal and new installation of plumbing fixtures, equipment and related piping.
Structural, foundation, earthwork on the cellar and 1st floor as indicated on drawings
Horizontal domestic gas piping replacement. Cellar floor only. No change in use, egress or occupancy. There are NO related DOB Now applications to this filing. This is solely a PL…