1,314 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,314 permits
2026 Auto Show @ JJC - Stellantis - Install a temporary exhibit within an existing exhibition building scheduled April 3rd-April 12th, 2026. No change of use, egress or occupancy u…
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
New eating and drinking establishment. New non load-bearing partitions, int. finishes, soundproof ceiling, storefront framing. New mech & air conditioning/venting. New type 1 hood…
Plumbing work in apt 2, 3, and 4 as per plans. no change in use, occupancy, or egress.
Interior renovation of apt 2, 3, and 4. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Mechanical modifications taking place at cellar, 1st, 2nd, and roof as per plans filed herewith. no change in use, egress, or occupancy.
Perform selective removal work, provide new HVAC equip & assoc ductwork, piping, controls, accessories, etc. Protect & reuse existing equipment as shown on plans. Application filed…
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or oc…
Work includes sounding the entire street facing facade, remove and replace defective stone with new pre-cast stones, repainting the cornice, repair unsound stucco, and recoating th…
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupanc…
Installation of temporary suspended scaffold equipment.
Hereby filing for the removal, replacement and relocation of plumbing fixtures in apartment 5n located on the fifth floor. no change touse occupancy or egress.
Installation of new partitions for gas piping installation as per plans. Installation of new partitions and door with damper on 1st floor. No change to occupancy, use, or egress.
11 story, 21 dwellings new building
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Plumbing changes on the 7th, 8th and 9th floors as indicated on drawings.