1,314 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,314 permits
Facade repairs to include masonry replacement, repointing and crack repairs, concrete crack and patch repair. No change in use, egress or occupancy.
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or oc…
Mechanical modifications taking place at cellar, 1st, 2nd, and roof as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupanc…
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
2026 Auto Show @ JJC - Stellantis - Install a temporary exhibit within an existing exhibition building scheduled April 3rd-April 12th, 2026. No change of use, egress or occupancy u…
Hereby filing for the removal, replacement and relocation of plumbing fixtures in apartment 5n located on the fifth floor. no change touse occupancy or egress.
Installation of new partitions for gas piping installation as per plans. Installation of new partitions and door with damper on 1st floor. No change to occupancy, use, or egress.
Proposed exterior facade repair (parapet, lintel, caulking, brick replacement, masonry, mortar joint pointing) no structural changes as per plans. no change in use egress or occupa…
11 story, 21 dwellings new building
Mechanical system for 19 dwelling new building
Plumbing changes on the 7th, 8th and 9th floors as indicated on drawings.
modify head location and branch piping to accommodate layout changes
Work includes sounding the entire street facing facade, remove and replace defective stone with new pre-cast stones, repainting the cornice, repair unsound stucco, and recoating th…
Facade Repairs and Roofing Membrane Replacement. No change in use, egress, or occupancy.
hereby filing to remove existing mechanical equipment and ductwork as shown on plans filed herewith. No change to use, occupancy or egress.
Modifications to existing mechanical systems and associated ducts and piping as per plans filed herewith. no change in use, egress, or occupancy.