1,126 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,126 permits
Mechanical modifications as per plans filed herewith for 49th floor (Construction), 69th floor (Marketing). No change in use, egress or occupancy. Filed in conjunction with DOB Now…
Removal of the existing window assembly, partial closure of the opening to include installation of new interior and exterior wall, and installation of a new window.
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Interior and exterior renovations to existing building including installation and replacement of finishes, minor masonry repairs and facade work. No change in use, egress or occupa…
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress o…
Installation of temporary beta max hoist as per plans. no change in use, egress or occupancy.
Soe work in conjunction with alt-co #m00972936.
Installation of new Plumbing fixtures and modifications to Sprinkler Systems as per plans filed herewith for 49th floor (Construction), 69th floor (Marketing). No change in use, eg…
Refiling of application 120157766 to register the domestic hot water boiler and storage tank.
Installation of plumbing fixtures as per plans filed herewith, no change to use, egress or occupancy
Relocate stairs from cellar to first floor.
Installation of temporary support system at existing chimney as per plans.
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m009729…
Remove and install hvac equipment in conjuncton with alt-co #m00972936. work on floors 1-3, rof.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Install of temp truss structure, no alt to exist structures for Michael Vinyl Record Installation. A TPA not required. Producer is responsible to monitor site safety & implement HW…