1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Modifications to existing plumbing and sprinkler systems. no change to use, occupancy or egress
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
Interior demolition of non load bearing partitions on the cellar (LL1), mezzanine and 1st floor (former Home Depot) as indicated on drawings.
Filing for plumbing and sprinkler work associated with interior renovation of sub cellar dolce vida as per plans submitted herewith.
Addition to & modification of the existing plumbing systems serving fifth floor rectory.
Sprinkler head changes as indicated on plans.
Hereby filing to remove and install sprinkler heads with related piping for office fitout as shown on plans filed herewith. No change to use, occupancy or egress.
install temporary construction fence
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Modification to the existing sprinkler system on the 32nd Floor (EQT Partners), as per plans. No change to use, egress, or occupancy.
Replace Pantry Plumbing Fixtures, Non-Gas Water Heater, Associated Piping & Water Line For Appliances, Install Funnel Drain, Drinking Fountains, Water Closet, Lavatory & Associated…
Mechanical changes as indicated on plans.
Demo Supplemental A/C Units&Piping, Replace Some Ductwork, Supply Air Diffusers&Return Air Grilles on 14&15 FL, Install A/C Unit, Piping&Ducts for IT Rm on 14 FL, Exhaust Fans&Duct…
Facade repair work as per plan. no change in use, egress or occupancy.
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on the 14th & 15th Floors. No Change to Occupancy, Use or Egress is Proposed
Renovation of existing rectory. remove/install non-load bearing partitions and finishes. no change in occupancy, use or egress. ms, pl and sp filed as subsequent.
Decrease of occupancy load from 285 to 280 persons on both 36th and 37th floor.
Installation and modification of plumbing fixtures and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Interior renovation of units 2805 & 2803 as per plans filed herewith. no change to use, egress, or occpancy.
Limited garage repairs, no change to layout, egress, use, or occupancy.