1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Structural alterations including new footings to the cellar, 1st floor, and roof, as required for installation of a MRI machine related to architectural application filed under app…
alterations to existing SP Systems as per plans filed herewith
Application for the installation of suspended scaffold filed herein. No change in use, egress, or occupancy.
Mh modifications on cel flr including redistributing supply, exhaust to new diffusers to adjusted family locker room &installing 6 threaded schedule 40 steel pipe from the cel mete…
Replacement of hvac system on floor 002 and roof with a total capacity of 7 tons. no change to egress, use, or occupancy.
Alteration of sprinkler and standpipe system associated with Alt-CO M01237433-I1.
Removal & construction of interior partitions, ceilings & doors.
Filing for temporary shoring. No change to occupancy, egress, or use.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Plumbing work filed herewith as shown on plans.
Mechanical work as per plans. No change in use, egress or occupancy.
Plumbing work filed in conjunction with interior renovation & combination of existing aparments as per plans filed. no change in use, egress or occupancy.
Installation of industrial rope access for facade inspections.
Brick replacement, lintel replacement, parapet rebuilding, brick corner rebuilding, steel reinforcement, terra cotta replacement, guard rail and railing installation at the bulkhea…
Relocation of existing gas head of service valve & gas meter, which will require a gas service/meter room to be constructed within a portion of the existing family locker room as p…
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Provide slab infill and support on 7th floor
Mechanical demolition on the 17th floor as indicated on drawings.
Interior renovaition on 27th floor office space as per plans. no change to use, egress or occupancy.