1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Garage repairs as per plans filed herewith. no change to use, egress or occuancy.
Plumbing scope: addition of shower in upper level hallway bathroom, replacement of existing fixtures in current locations per plans.
Modification of existing sprinkler system for the 8th floor office space as per plans. no change to use, egress or occupancy.
OT: Interior Renovation of Apartment 14E. No change in use, occupancy, or egress.
Mechanical modifications to take place on the 24th floor per drawings filed herewith. No change in use, egress, or occupancy.
General Construction to take place on the 24th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Installation of pre-action sprinkler system on the 41st construction floor (47th marketing) as plans filed herewith. no change in use, egress, or occupancy.
Sprinkler modifications on the 41st floor construction (47th floor marketing) as plans filed herewith. no change in use, egress, or occupancy.
Herewith filing 28 story new building.
Modification to existing HVAC system as per plans filed herewith.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Proposed renovation of an existing residential unit with partition & finishing work as per plans. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Plumbing modifications taking place on floors cel,1-11, 13-16, 20, 21, as per drawings filed herewith. no change in use, egress or occupancy.
Plumbing modifications taking place in the cellar, 1st floor, and 3rd floor as per drawings filed herewith. no change in use, egress and occupancy.
Interior demolition of 1st flr commercial space, including removal of non-load-bearing partitions, storefront glazing/doors within existing openings, soffits, finishes, lighting, a…
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Hereby filing interior renovation to residential apartment 11h. no change to use occupancy or egress under this application.
Temporary suspended scaffold as per drawings during nb const. filed sep. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…