1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Sprinkler modifications on the 41st floor construction (47th floor marketing) as plans filed herewith. no change in use, egress, or occupancy.
Modifications to existing mechanical systems in 26th floor commercial office space. no change to use, occupancy or egress
Modifications to existing mechanical systems in 37th and 38th floor commercial space. no change to use, occupancy or egress
Interior demolition of 1st flr commercial space, including removal of non-load-bearing partitions, storefront glazing/doors within existing openings, soffits, finishes, lighting, a…
Filing for maintenance rig slab traffic coating as per plans. there is no change to use, egress, or occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Herewith filing 28 story new building.
Plumbing modifications on the 41st floor construction (47th floor marketing) as plans filed herewith. no change in use, egress, or occupancy.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sid…
Plumbing work for Tokio HCC on 23rd marketing floor (22nd construction)
The scope of this project is interior build-out of tenant space including demo of existing construction, new construction and installation of partitions, floor and wall finishes, d…
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress
Exterior repair. No change in sue, occupancy, or egress.
Proposed interior renovation work for existing multi-family elevator buildings on 7th floor apt.7j. as per plan.no change of use,egress and occupancy.
Removal and installation of ductwork ,diffusers ,fans and related mechanical piping. no change to use, egress or occupancy.
Installation of a new sprinkler system on the 37th and 39th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
Modifications to the existing system to accommodate new layout.
Installation of illuminated accessory business channel letter wall sign, no change to use, egress or occupancy
Installation of suspended scaffold for facade work or inspection.