1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Structural modifications taking place on the Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Plumbing work at apt 15a-m on the 15th floor as per plans filed herewith
Renovation of first fl. lobby mailroom, and office. work includes removal and installation of partitions, doors, finishes, and concierge desk. no change to use, egress, or occupanc…
Mechanical work as per plans. No change in use, egress or occupancy.
Masonry facade repairs as per plans. No change in use, egress or occupancy.
Suspended Scaffold Installation as per plans filed herewith. No change in egress, use or occupancy.
Plumbing work filed in conjunction with interior renovation & combination of existing aparments as per plans filed. no change in use, egress or occupancy.
Interior renovation of an existing apt12e on 12th floor of an existing residential building. no change in occupancy,use or egress.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Modifications to existing sprinkler system on 12th floor (north) per plans. No change to use, egress or occupancy.
Removal and installation of interior partitions and finishes as per plans. Area of 1st floor increased by 470SF. Floor area relocated from 6th floor (filed under M01006077-I1). No…
Removal and installation of interior partitions and finishes at the 6th floor and new elevator openings at 7 & 27th floors. No change in use, egress or occupancy.
Exterior Facade work as per plans. No change in use, egress or occupancy.
Removal and installation of plumbing fixtures and associated piping for the 8th floor office space as per plans. no change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Filing for sprinkler work associated with the interior renovation of 11th & 12th floors for peerless clothing as per plans submitted herewith.