1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Application filed for mechanical additions/modifications on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per emergency letter. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building c…
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Installation of rated wall, door and platform in the cellar (Gas Meter Room) as per plans. No change to use, egress or occupancy.
55th Street Plaza bulkhead roof replacement, as per plans. No change to use, egress, or occupancy.
Application filed for an office to residential conversion and enlargement to the existing building.
Installation of new plumbing and sprinkler fixtures and fire hose station removal and installation
Temporary shoring and vault/sidewalk repairs as per plans filed herewith. No change to use, egress, or occupancy.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egr…
general construction work as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Combination and interior renovation of 2 existing apartments occupying part of the 10th fl, removal of non-load bearing partitions & finishes as per plans filed herewith. no change…