1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Temporary shoring and vault/sidewalk repairs as per plans filed herewith. No change to use, egress, or occupancy.
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egr…
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Installation of new plumbing and sprinkler fixtures and fire hose station removal and installation
Installation and use of temporary roof protection equipment as per plans filed herewith. no chance to use, egress or occupancy under this application.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…
Renovation of existing apartments 7F & 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change in use, egress, or occupancy.…
Mechanical changes as indicated on plans.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress o…
Removal of ductwork and associated equipment on the 1st floor as indicated on drawings.
Plumbing Fixture changes as indicated on plans.
Interior reno & demo of non-load bearing partitions, walls, ceiling & finishes as indicated on plans.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…