1,431 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,431 permits
Additions /Modification to existing Standpipe system /Sprinkler and Plumbing system as per plans filed herewith. Installation of new aux. fire hose cabinets & associated piping. No…
Illuminated non-advertising double-sided projecting accessory sign - ess a bagel. no change of use, egress or occupancy.
plumbing modifications taking place on the 32nd floor as per plans filed herewith. No change in use, egress or occupancy
Installation of plumbing fixtures and associated piping for the 20th floor office space as per plans. no change to use, egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Herewith filing for interior renovation. general construction job no. m00913255-i1
Removal of interior non-load bearing partitions, doors, and related finishes
WCM Lobby, Cellar; Plumbing, Sprinkler work to accommodate the Primary Care Renovation in the existing building.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Filing herewith the mechanical work to the existing system as per the plans. No change to use, egress, or occupancy.
Herewith filing for interior renovation of apt. 20g as per plans filed herewith. no change in use, occupancy or egress.
Illuminated non-advertising accessory wall sign - ess-a-bagel. no change of use, egress or occupancy.
Installation of ductwork, diffusers, fans, a/c unit, and related mechanical piping. on 20th floor office space. no change to use, egress or occupancy.
Application for installation and use of suspended scaffold as per plans filed herein. No changes in egress, use or occupancy.
Mechanical work for tenant Slarskey on 32nd marketing floor (31st construction)