1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Suspended Scaffold for Facade Restoration and Material Hoisting as Shown on Plans
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Removal and installation of non-load bearing partitions, doors, frames, flooring, ceiling and related finishes as per plans filed herewith. No change in use, egress or occupancy un…
Interior renovation of apartment 8nc including kitchen and bathroom renovation.
Modification/additions to existing supply and return air ductwork, diffusers and transfer ducts. No change in use, egress or occupancy under this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Scaffold installation and mechanical means for plaza Demo
Heavy duty sidewalk shed during facade repairs filed under application # m01357004. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress unde…
Office renovation for Charles Bank Includes new offices, open workstations, conference rooms, pantry, Elevator lobby, and core restrooms. Provide VAV system for all areas, Suppleme…
Removal and instillation of interior non load bearing partitions and related finishes of existing business offices. No change in use, egress or occupancy.
Removal of sprinkler heads and installation of temporary sprinkler loop on the 1st floor as indicated on drawings.
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapt…
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st and 2nd floors. Subsequent plumbing application to be filed. All in accordanc…
Apartment renovation and installation of new finishes (20th floor, apt. 20c). no change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection