1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st and 2nd floors. Subsequent plumbing application to be filed. All in accordanc…
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Apartment renovation and installation of new finishes (20th floor, apt. 20c). no change in use, egress, or occupancy.
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
Removal of sprinkler heads and installation of temporary sprinkler loop on the 1st floor as indicated on drawings.
Removal and instillation of interior non load bearing partitions and related finishes of existing business offices. No change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapt…
construction fence will be used to protect site, during full demolition.
Installation of temporary suspended scaffold equipment (material hoist - counterweighted system).
Application filed accessibility upgrades at entrance ramp on exterior of building along Lexington Avenue
installation of construction fence to protect site during full demolition
Condenser water piping and valve replacements from cellar to roof
Filing herewith for Anchor point supports and infills on cellar, 1st-4th & Roof.