881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
provide new sanitary facilities for office in conjunction with Alt #M01355130 as per plans filed
Filing SOE work for Reach 7 - Filing for the construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project including support of excavation for…
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Modification of existing sprinkler system for 14th floor office space. no change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Overhead protection for occupants at courtyard.
General construction for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
T-Mobile: Relocation of existing antenna sector and installation of kickbacks on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection at neighbor roof at 109 washington street and 110 greenwich street.
Sprinkler work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.
Standpipe work as shown on plans filed herewith
Installation of pipe scaffold stair tower as per plans. stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Lmh ct 187: modification of interior partitions and finishes to accommodate alterations within the existing hospital building as per plans. no change to use, egress or occupancy.
Temporary Installations to be used on a temporary event Pier 17 Rooftop Summer Concert Series. All the Installations are to be removed upon completion of the event.
Hereby filing for the renovation of unit 3g (installation of plumbing fixtures). no change in use, egress or occupancy.
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenw…
Modifications of the existing sprinkler system and installation of TCSP. No change in use, egress of occupancy.
Mechanical work for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)