881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Modifications of the existing sprinkler system and installation of TCSP. No change in use, egress of occupancy.
Modification of existing sprinkler system for 14th floor office space. no change to use, egress or occupancy.
Standpipe work as shown on plans filed herewith
General construction for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
Installation of pipe scaffold stair tower as per plans. stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection at neighbor roof at 109 washington street and 110 greenwich street.
Overhead protection for occupants at courtyard.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Temporary Installations to be used on a temporary event Pier 17 Rooftop Summer Concert Series. All the Installations are to be removed upon completion of the event.
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenw…
Lmh ct 187: modification of interior partitions and finishes to accommodate alterations within the existing hospital building as per plans. no change to use, egress or occupancy.
Hereby filing for the renovation of unit 3g (installation of plumbing fixtures). no change in use, egress or occupancy.
Plumbing work associated with the conversion of the building
Install of temporary window protection per plan. no change in use, egress, or occupancy. the window protection on 4 windows on the s elev at 110 greenwich st and w elev 108 greenwi…
Temporary installation of adjustable suspended scaffold for facade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: darius janczak
Installation and use of temporary sidewalk shed equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 51st floor as per plans filed herewith. no change in use, egress, or occupan…
Interior plumbing demolition work as shown on filed plans
Interior renovation and mechanical hood of for commercial kitchen at basement floor #c4, as per plan filed herewith. no change in use, egress or occupancy.