881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
Herewith filing for installation of non-load bearing partition for floors 3,5,7,9,10,11,12,13,14,18,19 (construction floor apt # 3i, 5i, 7i. 9i, 101, 111, 121, 13i, 14i, 18i, 19i,…
Minor interior demolition and alteration works for 14th floor office space. no change to use, egress or occupancy.
HEREWITH FILING For the repair and replacement of floors as needed, replacement of counter tops, cabinets and appliances. repair replace tile and painting as per plans filed herewi…
Interior renovation and mechanical hood of for commercial kitchen at 001 stall#s6, and basement floor #c3, as per plan filed herewith. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
Removal and installation of ductwork diffusers, fans, and related mechanical piping for 14th floor office space. no change to use, egress or occupancy.
Removal of mechanical ductwork and AC units on the cellar and 5th floor as indicated on drawings
Application filed for legalization of general construction and interior demolition on the 8th floor. No change in use, egress, or occupancy.
Replace/relocate sprinkler heads as per plans. no change to use, occupancy or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Direct replacement of plumbing fixture in kitchen, and in 2 bathrooms, and the removal and the replacing of bathtub after capping it with a closet in apt#940
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floo…
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Installation of interior temporary working platofrm & overhead protection shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, e…
Sprinkler and Standpipe Systems filed in conjunction with ALT #122420193