881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Installation of suspended scaffold for facade work or inspection
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Removal of mechanical ductwork and AC units on the cellar and 5th floor as indicated on drawings
Removal and installation of ductwork diffusers, fans, and related mechanical piping for 14th floor office space. no change to use, egress or occupancy.
Application filed for legalization of general construction and interior demolition on the 8th floor. No change in use, egress, or occupancy.
Installation of interior temporary working platofrm & overhead protection shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, e…
Interior renovation and mechanical hood of for commercial kitchen at 001 stall#s6, and basement floor #c3, as per plan filed herewith. no change in use, egress or occupancy.
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floo…
Sprinkler and Standpipe Systems filed in conjunction with ALT #122420193
Replace/relocate sprinkler heads as per plans. no change to use, occupancy or egress.
Direct replacement of plumbing fixture in kitchen, and in 2 bathrooms, and the removal and the replacing of bathtub after capping it with a closet in apt#940
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Plumbing modifications taking place on 13th floor as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing Systems filed in conjunction with Alteration M01134265. Cap & Remove Existing Fixtures and Branch Lines. Installation of New Fixtures on New Roughing connecting to existin…
Interior demo of 13 floor (marketed as 14) offices. Provide partitions and finishes for portion of floor, ceiling to remain open AS PER PLANS FILED NO CHANGE IN USE OCCUPANCY OR EG…
Installation of construction fence and heavy duty sidewalk shed as per plans. equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…