881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Replacement of loading dock and associated steel
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Provide duct layout changes to the existing HVAC system in conjunction with Alt #M01349048 as per plans filed no change in use occupancy or egress
Alt2 filed herewith for 8th floor interior alteration. scope to include new interior partitions, lighting and replacement of existing plumbing fixtures. no change in use, occupancy…
Propose installation of new plumbing fixtures, sprinkler heads and associated piping. No change in use, egress or occupancy.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Filing to update the mechanical systems for the base building infrastructure as shown per plan. Please see comments for full description.
General construction for removal of existing boiler flue in courtyard, as shown on plans filed herewith. No change to use, egress, or occupancy.
Renovate 2nd floor office space as per plans. no change in use, egrss or occupancy.
Subsequent filing of interior plumbing work in conjunction with dob#m01358323-i1 (gc: bubble tea shop). work includes installation of new pl fixtures(sinks) as per the plan herewit…
Interior renovation of existing offices at floors 4, 5, and 10. Work includes removal of existing non-loading partitions and finishes to be replaced as per plans filed. No change t…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Plumbing legalization application for the removal of plumbing fixtures on floors 2-14.
Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.
Propose to perform interior renovations. No change in use, egress or occupancy.
General construction as per plans filed herewith. no change to use egress or occupancy.
Installation of new catwalk on the 5th floor and 6th floor. no change in use, egress or occupancy.
Interior renovation/Fit out for new office with existing demising walls as per plans filed herewith. No change to use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.