1,189 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,189 permits
Modification to existing mechanical system serving space. Reuse of existing VAV boxes and associated controls. Modification of ductwork as necessary to accommodate new layout.
Minor renovation of existing commercial space at the first floor proposed wendy's store, relocate and install new plumbing fixtures and associated piping.
Interior soft demolition of the existing office as per plans. No change to use, egress or occupancy
Sprinkler work as shown on plans filed herewith.
The architectural scope of work filed under this application is limited to removal of an existingfacade and replacement with a curtain wall facade for the north elevation (pine str…
General Construction taking place on the (29th Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.
General Construction taking place on the 33rd, 34th, 35th and 36th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
Install new steel tubing at the stairwell between 4th floor and 5th floor for supporting new 2 hour rated partition wall
Mechanical work for the renovation to existing units 5g, 10k, 15a as per plans filed herewith. no change to use, egress, or occupancy.
Mechanical work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
General Construction taking place on the (34th Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.
Application to file an Alteration Type One for Base Building Change of Use, Egress and Occupancy per per plans filed herewith. General demolition and construction of covered pedest…
General construction for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
Provide pantry sink and HWH for existing office space in conjunction with Alt # M01349048 as per plans filed no change in use occupancy or egress
Replace existing non-illuminated accessory storefront business awning, face change only, no change in use, egress, or occupancy.
General Construction taking place on the (33rd Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.
Filing for Mechanical Systems modification including the removal of existing duct, piping, equipment and the installation of new duct, piping and equipment as shown per plan. No ch…
Mechanical modifications as per plans filed herewith. installation of commercial cooking and exhaust system in first floor kitchen. no change to use egress or occupancy.
Selective removal of the existing facade on pine st and wall st, g-l05. removal of interior finishes on floors g-l1. no interior demolition on floors l2-l5. no change in use, egres…
Modifications to the existing fire protection system as shown on the plans filed herewith