881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Non-illuminated non-advertising double-face projecting accessory banner sign for trinity church approved by nyc landmark preservation commission lpc-26-06420 - trinity church. no c…
LMH CT 187: Plumbing and sprinkler modifications to accommodate the CT upgrade in the existing hospital building as per plans filed herewith only. No change to zoning, use, egress…
Installation of interior non-load bearing partitions, doors/frames, flooring, ceilings and finishes as per plans filed herewith. No change in use, egress or occupancy under this ap…
Interior renovation of partial 1st floor lobbies, corridors, mail rooms and elevator vestibules. Remove/replace non-load bearing partitions, fixtures, and finished as per plans fil…
Installation of temp inflatable, no alt to exist structures for Messi Inflatable. TPA permit NOT required. Producer is responsible to monitor site safety & implement HWAP. All prod…
Installation of temporary suspended scaffold equipment.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Mechanical scope for interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
Relocation of conduit
Installation of 7000 lb dual personnel/material hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupa…
Filing Support of Excavation work for Reach 5 - Support of Excavation filing for construction of a flood barrier system and two bridging structures for the BPCA North/West Battery…
Filing Mechanical work for Reach 5. Mechanical installations inside underground bridging structures for the BPCA North/West Battery Park City Resiliency project. No heating and coo…
Interior alteration within existing tenant space on 1st floor and partial cellar in existing building: modify existing / install new sprinkler heads per new layout. no change to oc…
Herewith filing for interior modifications in the cellar, 3rd- 13th floors. no change to use, occupancy, or egress.
Filing for interior reno of 4th floor ibo office as per plans submitted herewith.
Filing for interior renovation of 4th floor ibo office space as per plans submitted herewith.
File plumbing work for eating & drinking establishment at 1st floor s6, and basement floor #c3 as per plan filed herewith. no change in use, egress or occupancy.