881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary suspended scaffold equipment.
Herewith filing for installation of non-load bearing partition for floors 3,5,7,9,10,11,12,13,14,18,19 (construction floor apt # 3i, 5i, 7i. 9i, 101, 111, 121, 13i, 14i, 18i, 19i,…
Structural modifications as per plans filed herewith. No change to use, egress or occupancy.
Minor interior demolition and alteration works for 16th floor office space. no change to use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Reach 5 - filing for Earthwork/ Construction of a flood barrier system and two bridging structures for the BPCA North/West Battery Park City Resiliency project. No change of use, o…
Mechanical demolition taking place on the 1st, mezz, 2nd, and 3rd floors and on the roof as per plans filed herewith. no change in use, egress, or occupancy.
Non-illuminated non-advertising double-face projecting accessory banner sign for trinity church approved by nyc landmark preservation commission lpc-26-06420 - a parish in the city…
MPP Project # 000000370 approved by project advocate Roceli Zimmerman. Alt-CO being filed for the conversion of a commercial building to a residential use per Article 1 Chapter 5.
Structural work for removal of few steel beams and installation of new steel framing, new floor opngs. and reinforcement of existing steel framing of the 5th, 27th, 28th, 29th & 30…
HEREWITH FILING For the repair and replacement of floors as needed, replacement of counter tops, cabinets and appliances. repair replace tile and painting as per plans filed herewi…
Structural work as shown on the plans.
Plumbing and sprinkler work for the renovation to existing unit 11o as per plans filed herewith. no change to use, egress, or occupancy.
Modifications to the existing Sprinkler System: Remove (360) existing sprinkler heads and Install (654) new sprinkler heads and associated piping on the 8th Floor as per plans (Mor…
Non-illuminated non-advertising double-face projecting accessory banner sign for trinity church approved by nyc landmark preservation commission lpc-26-06420 - trinity church. no c…
Installation of construction fence and heavy duty sidewalk shed as per plans. equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under…