655 issued permits in Greenwich Village, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
655 permits
Modification to existing sprinkler system as indicated on plans
Installation of sidewalk shed for pedestrian protection.
Temporary pipe scaffold during bldg renovation/enlargement filed separately under app # m01034950. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or e…
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occup…
Installation of new fire sprinkler service in 1-Family Dwelling on the Cellar, Basement, 001-004 Floors attached to combined water service.
Renovation of an existing duplex penthouse apartment. Architectural work as per plans. No change of use, occupancy or egress.
Installation of supported scaffolding for facade repairs.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no changes in use, egress or occupancy in this application.
Interior renovation at apt. 14a on 014. minor partition workand plumbing work as per plan. plumbing work will be filed subsequently with this application. no change in use, egresso…
Architectural demo scope only associated with the ROOF work at the New School. No change of use, egress or occupancy.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Triplex. mechanical work for renovations of aparmtmens 2ab/3b as per plans.
Triplex. combination of apartments 2ab/3b as per tppn #3/97, new convenience stair connecting 1st & 2nd floors & smoke-proof partition, new convenience stair connecting 3rd & 2nd f…
Propose masonry window openings on 6th fl on east facade and 12th floor on east facade at the corner condition.
Facade Inspection via Industrial Rope Access
Construction of new interior non-load bearing walls and ceilings with wall, floor and ceiling finishes on first and second floors of existing commerical space.
Facade Inspection. Designated Primary Site supervisor: Jesus Decola
Interior renovation of first, second, and third floors including 2 new convenience stairs and adjusted window openings.no change in use, occupancy, or egress.