653 issued permits in Greenwich Village, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
653 permits
Facade Inspection. Designated Primary Site supervisor: Jesus Decola
Construction of new interior non-load bearing walls and ceilings with wall, floor and ceiling finishes on first and second floors of existing commerical space.
Triplex. combination of apartments 2ab/3b as per tppn #3/97, new convenience stair connecting 1st & 2nd floors & smoke-proof partition, new convenience stair connecting 3rd & 2nd f…
Interior renovation of first, second, and third floors including 2 new convenience stairs and adjusted window openings.no change in use, occupancy, or egress.
Triplex. mechanical work for renovations of aparmtmens 2ab/3b as per plans.
Propose masonry window openings on 6th fl on east facade and 12th floor on east facade at the corner condition.
Facade Inspection via Industrial Rope Access
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Installation of a heavy duty sidewalk shed to include storage.
Modification to exisiting sprinkler system,no change to use, egress, or occupancy.
Intallation of new steel members as required to infill opening with new metal deck at second floor and install new steel dunnage connected to existing steel dunnage and parapet at…
Interior renovation at 001 floor store with general constructionwork asperplanfiledherewith . no change of use, egress orcertificate of occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of mechanical duct work in commercial spaces on first and second floors and new roof top mechanical units on existing steel dunnage using existing rooftop penetrations…
Renovation of existing eating and drinking establishment at first floor. Work include install new mechanical units with dunnage at roof. No change in use, egress or certificate of…
Conversion of first and second floors from retail use to eating and drinking Occupancy Croup A-2 and obtaning Certifiacte of Occupancy for same.
Structural scope only associated with the renovation of the 005 FL at the New School including dunnage on a roof. No change of use, egress or occupancy.