1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
Salomons-- mechanical modifications and installations for retail renovation as per plans filed.
Salomons-- general construction inclusive of partitions modifications as per plans filed herewith. no change to use, egress, or occupancy.
Demolition of non-load bearing paritions, intallation of new partitions, doors and finishes on the first (1st) floor, apt. 1ds as per plans. no change to use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary betamax hoist as per plans. no change in use, egress or occupancy.
Structural reinforcements related to restaurant renovation, Support for (1) folding partition, removal of existing canopy.
Subsequent filing for sprinkler and standpipe works in conjunction with alt-co application # m01053870.
Interior renovation of Apartment 8 construction of interior partitions, fixture and finishes. No change to occupancy use and egress.
Mechanical System modifications related to Restaurant Renovation.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Application filed for mechanical modifications/additions on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Removal and installation of interior partitions, floorinmg and fixtures. no change in use, egress or occupancy.
Installation of new awnings as per plan herewith. no change in use, egress or occupancy.
Construction build out of existing restaurant on 1st floor which is a white box, renovation includes demolition of existing non loading bearing partitions. a new restroom to be add…
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical work on the 10th floor (LB Pharma expansion) as indicated on drawings.
Install new plumbing fixtures as per plan. there is no change of use, egress, or occupancy filed under this plan
Provide mechanical work including vrf heating and cooling systems, building ventilation systems. install mechanical exhaust hood work for commercial kitchen of eating and drinking…
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc