1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Mechanical modifications as per plans
Filing herewith sprinkler and plumbing modifications as per plans
facade repair, Masonry Replacement and Terracotta Patching as per plans filed. No change in use egress or occupancy.
Structural framing with steel on 18th and 19th floors. no change in occupancy, use or egress.
Renovation of guestrooms demolition of a limited number of non-load bearing partitions on floors 4-17, revised bathroom layout in the presidential suite on the 12th floor per plans…
Installation of temporary construction hoist as per plans during general construction work. no change in use, egress or occupancy. hoist installed in accordance with 2022 nycbc, ch…
Minor demolition with installation of new partitions on the 1st floor (Security Office Expansion) as per plans. No change to Use, Egress or Occupancy.
Subsequent filing for sprinkler and standpipe works in conjunction with alt-co application # m01053870.
Propose to perform interior renovations. No change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Plumbing & sprinkler work associated with interior renoation of 1st floor commercial space. all as per plans and applications. no change in use, egress or occupancy.
Spot brick pointing & minor brick replacement as per plans. no change in use, egress or occupancy with this application
Interior modifications in suite 501 on the and the bathroom on the 5th floor. includes removal of select existing ductwork and mechanical components, installation of new split syst…
Filing herewith general construction to include interior renovation and minor demo as per plans
Modification of mechanical ductwork and installation of ac units.
Filing herewith Plumbing and sprinkler modifications as per plans
Removal of existing ductwork, diffusers, fans, associated piping, and associated supports on the 7th, 8th, and 9th floors as per plans. no change to use, egress or occupancy.
Selective removal of designated existing partitions, doors, floor finishes, ceiling finishes and lighting fixtures as per plans. no change to use, egress or occupancy.
Sprinkler modifications related to Restaurant Renovation.
Filing for limted exterior repairs; no change to use, egress, or occupancy.