1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
Application filed for sprinkler modifications/additions on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
modification to an existing Sprinkler system to match new space tenants fit out
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Proposed to add (1) sink on each 3rd and 4th floors. No changes to use, occupancy, or use.
Plumbing work on the 53rd floor (MGG Expansion) as indicated on drawings.
Installation and use of temporary sidewalk shed as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Renovate existing apartment ph12 on the 12th floor. demo and construct non bearing interior partitions, cabinetry and finishes. no change to use, egress or occupancy. mechanical, p…
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. install hvac units & associated ductwork. install new condensers on roof. install…
Update the gas fired cooking equipment and fire suppression shut off on 1st floor as shown in drawings. there is no change in use, occupancy or egress under this application.
Mechanical work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Modifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Installation of temporary shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.
Plumbing work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. install plumbing fixures and associated piping. no change to use, egress or occupan…
Provide 1 new DOAS terminal unit and associated ductwork and piping and controls. Relocate 4 existing DOAS terminal units and provide new ductwork distribute to accommodate new lay…
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
Installation and modification of plumbing fixtures as per plans.
The scope of work consists of repairing loose and missing veneer components of the building envelope. No change in use, egress, or occupancy.