1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Removal and installation of plumbing fixtures and related piping, no change to use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 6th and 7th floor as per plans filed herewith. no change in use, egress, or…
Window leak inspection and caulking via indusrial rope access
Salomons-- plumbing modifications and installation for retail renovation.
Fisp inspection via industrial rope access
Filing sprinkler application to reflect new sprinkler heads as per plans filed. no change to use, egress or occupancy.
Modification of existing sprinkler system no change in use, egress or occupancy.
Modifications to the existing sprinkler system on the cellar and 1st floors as per plans. No change to use, egress or occupancy.
Structural Vault Repairs, Replacement of Concrete Sidewalk and Repair of Misc. Masonry Systems within Cellar. No change in use, occupancy or means of egress.
Propose installation of (2) air cooled condensing units and (2) air handling units. No change to use, egress or occupancy.
Minor work to combine units #b & c on the 5th floor per tppn#3/97. removal of a minor portion of the non-load bearing partition between the units as per drawings filed herein. no c…
New HVAC work to install one condenser unit, two air handlers, and related piping. No change in use, egress, or occupancy.
Interior renovations at 200 park ave south suite 501 & 5th floor bathroom for interior partitions & lighting. no change inuse, egress, or occupancy.
Suspended scaffold outrigger system at 245 5th avenue, manhattan for facade restoration work with inspections. there will be no change in the use, egress, or occupancy under this a…
Application filed for mechanical additions/modifications on the 10th floor & 5th floor roof setback as per plans filed herewith. no change in use, egress, or occupancy.
Sidewalk shed for emergency protection of public. no change in use, egress, or occupancy.
Installation of sidewalk shed for public protection during construction work. no change in use, egress or occupancy.
Sprinkler work as per drawings filed herewith.
Interior renovation including installation of partitions on 11th floor as per plans. No change in use, egress or occupancy.
Respectfully request to relocate (2) bathrooms & renovate kitchenette. No change in use, egress, or occupancy.