1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Proposed to add (1) sink on each 3rd and 4th floors. No changes to use, occupancy, or use.
Structural modifications to take place on the cellar, first floor, and second floor as per plans filed herewith. No change in use, egress, or occupancy.
Plumbing work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. install plumbing fixures and associated piping. no change to use, egress or occupan…
Plumbing work on the 53rd floor (MGG Expansion) as indicated on drawings.
Plumbing work in the cellar (concourse marketing floor), 1st and 2nd floor as plans filed herewith. no change in use, egress, or occupancy.
Mechanical work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Provide 1 new DOAS terminal unit and associated ductwork and piping and controls. Relocate 4 existing DOAS terminal units and provide new ductwork distribute to accommodate new lay…
Installation and use of temporary sidewalk shed as per plans filed herewith. no change to use, egress or occupancy under this application.
Plumbing modifications for 16th floor commercial space
Renovate existing apartment ph12 on the 12th floor. demo and construct non bearing interior partitions, cabinetry and finishes. no change to use, egress or occupancy. mechanical, p…
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.
Installation and modification of plumbing fixtures as per plans.
Update the gas fired cooking equipment and fire suppression shut off on 1st floor as shown in drawings. there is no change in use, occupancy or egress under this application.
The scope of work consists of repairing loose and missing veneer components of the building envelope. No change in use, egress, or occupancy.
Sprinkler work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. modify existing sprinkler system for new apartment layout. install sprinkler heads…