1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
Plumbing work on the 53rd floor (MGG Expansion) as indicated on drawings.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Modifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Propose new illuminated signages for existing commercial space. no chnafge to use, egess or occupancy.
Hotel Lobby Renovation
Modifications to the existing plumbing fixtures as per plans filed herewith. No change to use, egress, or occupancy.
General Construction to take place on the cellar, first floor, and first floor mezzanine as per drawings filed herewith. No change in use, egress, or occupancy.
Renovation of store at 1st floor and cellar level as well as provision of new equipment platform on the third floor.
Feldman Econ: Modification of HVAC Equipment and Ductworks to accommodate installation of a new waterside economizer as indicated on plans filed herewith. No change to use, egress…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of temporary roof protection netting as per plan. no change in use, egress or occupancy.
Interior demolition/partition work to be done on existing 11th floor of12 story commercial building. no lighting, mechanical, or plumbing to bedone under this application.no change…
Structural modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy Bridgewater Terrace
B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupa…
Mechanical modifications to take place on the first floor as per plans filed herewith. No change in use, egress, or occupancy.
New mechanical exhaust system for proposed 3rd floor beauty salon atexisting commercial unit. existing use group 6. no change in use,occupancy or egress.
Application filed for plumbing modifications/additions on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary pipe scaffold as per plan as per plan. no change in use, egress or occupancy.
Create a new floor opening only between 4th and 5th floor in conjunction with job #m01359221. no change in use egress or occupancy