1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Retail#3 removal and installation interior non load bearing partitions and finshes as per plan
Retail 3 - plumbing - removal of interior non load bearing partitions and finshes as per plan
General construction to the main roof and upper roof as per plans filed herewith. No change in use, egress, or occupancy.
Propose to perform the construction of steel support for the installation of mechanical units from the back wall on the 5th level. No change to use, egress or occupancy.
Renovation of existing commercial space. Work includes partitions, flooring & ceiling, mechanical work for new kitchen exhaust and ventilation systems and rooftop dunnage for units…
Replacement of condensing units on existing dunnage at the 3rd floor roof.
Application filed for plumbing additions/modifications on the 3rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work from the 56 to the 58th floors as plans filed herewith. no change in use, egress, or occupancy.
Application filed for sprinkler additions/modifications on the 3rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Renovation of existing commercial space, finishes, millwork, sanding, painting, flooring and lighting work. all as per plans and applications. no change in use, egress or occupancy…
It is proposed to modify existing plumbing system and sprinkler system to cap/remove/replace and/or install new plumbing fixtures and sprinkler heads and related piping as shown on…
Fisp repairs. no change in use, egress or occupancy.
Interior renovation of Eating & Drinking Establishment at 1st Fl. & storage/accessory space at Cellar. Incl walls/finishes removal, storefront replacement, walk-in units removal &…
Modifications to the existing HVAC system on the 8th floor (Demo) as per plans. No change to use, egress or occupancy
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Application filed for plumbing additions/modifications on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Respectfully request renovation to existing commercial space. new flooring, cabinetry, non load bearing partitions. No change in use, egress, or occupancy.
Application filed for sprinkler additions/modifications on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Modification of plumbing piping at 6th floor and plumbing piping + fixtures at 7th floor as shown on plans
Storefront modifications per LPC requirements, new glassing, frames, bulkhead, transom