1,687 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,687 permits
Fit goodman ac: modification of hvac equipment and ductwork to accommodate alterations within the existing building as per plans. no change to use, egress or occupancy.
Installation of temporary roof protection netting as per plan. no change in use, egress or occupancy.
Hotel lobby renovation includes demolition of existing non loading bearing partitions. a new hotel lobby office and public restrooms, new finishes will be provided.
Mechanical modifications to take place on the first floor as per plans filed herewith. No change in use, egress, or occupancy.
B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupa…
Modifications to the existing plumbing fixtures as per plans filed herewith. No change to use, egress, or occupancy.
General Construction to take place on the cellar, first floor, and first floor mezzanine as per drawings filed herewith. No change in use, egress, or occupancy.
Plumbing work as shown on plans filed herewith.
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
To file the sprinkler job to address local law 26 of 2004. no change of use, egress, and occupancy.
Replace air conditioning unit.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Interior demolition of non load bearing partitions on the 21st floor (SW corner, former EyeBio) as indicated on drawings
Minor alterations with new certificate of occupancy.
Temporary work platforms as per drawings. work platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Exterior facade and roof flashing repairs. No change to use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this ap…
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.