1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Mechanical systems modifications on 14th floor as indicated on plans. no change in use, egress or occupancy.
...
Structural work filed in conjunction with unit renovation
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.
Installation of fitout scope for front of house and back of house restaurant and kitchen occupancies as per plans filed herewith. No change in use, egress, or occupancy.
Removal and Installation of non-load bearing partitions as per plans filed herewith. No change in use, egress, or occupancy.
Interior renovation to combine units 101 & 102 into one class aunit. partition changes to non-load-bearing walls as per plans.no change in use, occupancy or egress.
Renovation of an existing first floor retail space. installation of new non-bearing walls and doors and minor change to egress at western stair from cellar. no change in use, occup…
Propose installation of (4) air-cooled condensing units. No change to use, egress or occupancy.
Install fire sprinkler system as per plans.
Banana Republic Factory Store # 8392. Minor remodel of existing space. Removal and replacement of backwrap, hagrods, flooring and ceilings finishes and fixtures per plans filed her…
Modification of existing sprinkler system as per pipe schedule. no change in use, egress or occupancy.
Subsequent filing of plumbing & sprinkler work in conjunction with m01374129-i1 (gc: unit 506). work includes installation/modification of pl fixtures & sp heads as per the plans h…
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress u…
Additions and modification to existing Plumbing and Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Office renovation on 14th flr. work to include partition, ceiling, and door modifications as indicated on plans. no change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Renovation of existing retail store as per plans filed. No change in use occupancy or egress.