1,659 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,659 permits
Structural work in connection with the interior renovation of existing commercial space. no change in use, occupancy or egress.
Installation of a temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Structural reinforcement of existing fire stairs, masonry repairs.
Filing herewith mechanical work for the building at the address listed. includes new toilet exhaust systems. no change to use, egress, or occupancy.
Additions/Modification to the existing HVAC system on the 18th Floor-Suite-1801 ( Viabizzuno Ste) as per plan. No change to use, egress or occupancy
Application filed for Plumbing and sprinkler modifications/additions as per plans filed herewith.
Exterior restoration as per plans filed herewith, No change to use, egress or occupany
Plumbing and sprinkler work in conjunction with the renovation of the apartment on plans filed herewith. no change in use, egress or occupancy (5th floor)
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 3rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Proposed cafe in existing commercial space including finishes, lighting, electrical, plumbing and hvac system. proposed new storefront and new stair bulkhead at roof.no change in u…
Installation and use of temporary supported scaffolding as per plans filed herewith. no change to use, egress or occupancy under this application.
Plumbing work as per submitted plans. no change in use, occupancy or egress with this filing.
Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.
Facade repair
Structural work related to renovation of store at 1st Floor, 1st Floor mezzanine, and cellar, including new mechanical equipment platform and addition of a new stair opening betwee…
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 10th fl (suite 1007) as per plans filed herewith. no change in use,egress, o…
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.