1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Modification of an existing sprinkler system as per plans submitted herewith, no change in use, egress or occupancy group
Mechanical plans filed herewith to show replacement of existing AC equipment with new split heat pump system, reconnect new air handling unit. No change to use, egress, or occupanc…
Propose installation of (2) air-cooled condensing units & (2) air handling units. No change to use, egress or occupancy.
Plumbing modifications taking place on the 71st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Installation of sidewalk shed for public protection during construction work. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
New slab infill on floors 19-21 as per plans.
Work includes partial demolition of existing walls and finishes as shown on plans. New convenience stair (PDA00007812), restrooms, & finishes on 5-7TH for a single tenant. Glass en…
Erect an illuminated business accessory window sign. no change in use, egress, or occupancy.
Sprinkler work on the 38th floor (corridor) as indicated on drawings.
Hereby filing alt 1 to reflect accessory office on 16,17 & 18 floor and update the total number of rooms.
Installation of new business accessory awning at osp as per plan. no change in use, occupancy or egress.
Propose installation of (3) air-cooled condensing units. No change to use, egress or occupancy.
Fire-rated partition work to create two places of assembly and reduction of the existing office occupant load.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy.
Install Structural Steel to Support Equipment, Light-Gauge Framing to Support New Storefront, Ductwork and Ceilings on Part of 1st Floor
Northwest setback roof replacement on the 13th Floor, as per plans. No change to use, egress, or occupancy.
Mechanical modifications to include interior demo work and Interior renovations to the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
Propose to perform interior renovations for removal and construction of non-load bearing partitions and finishes as per plan. No exterior work. No change in use, egress or occupanc…
Minor Interior removals of non-load bearing partitions and ceilings. No change in occupancy, use or egress.