1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Install Structural Steel to Support Equipment, Light-Gauge Framing to Support New Storefront, Ductwork and Ceilings on Part of 1st Floor
General Construction filed herewith for interior renovation of office tenant space (suite 804) as per these plans. No change to use, egress, or occupancy.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy.
Ground-Level Facade Work per plans: Storefront awning framing and connections. All work below 40ft. No change to egress, use or occupancy.
Propose installation of (3) air-cooled condensing units. No change to use, egress or occupancy.
plumbing modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy
Sp work as per plans in conjunction with alt2 application
Installation of pipe scaffold as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Structural work filed in conjunction with the eating & drinking establishment renovation as per plan. No change in use, egress, or occupancy under this application
Filing for new plumbing and sprinkler work associated w/tenant fit out, as per plans submitted herewith. No change to use, egress or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Application filed for sprinkler additions/modifications on the 7th floor as per plans filed herewith. no change in use, egress, or occupancy.
Subsequent filing for sprinkler and standpipe works in conjunction with alt-co application # m01053870.
Plumbing work at apt 4e at partial 4th floor as per plans filed herewith
Filing for sprinkler work associated with the interior demo of the 30th floor as per plans.
Erect illuminated non advertising Halo/Back sign on wall. No change of use, egress or occupancy
Alt. GC filed for interior renovation demo and to erect new non-load-bearing partition, doors, flooring, millwork and finishes. No change in use, egress and occupancy.
Modifications to the existing sprinkler system on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy.
Minor demolition. Installation of partitions, doors ceilings on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy.