1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Erect illuminated non advertising Halo/Back sign on wall. No change of use, egress or occupancy
Alt. GC filed for interior renovation demo and to erect new non-load-bearing partition, doors, flooring, millwork and finishes. No change in use, egress and occupancy.
Sprinkler modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy
Modifications to the existing sprinkler system on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy.
Minor demolition. Installation of partitions, doors ceilings on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy.
General construction modifications for interior demo work to the 12th floor as per plans filed herewith. No change in use egress or occupancy.
Filing for new plumbing and sprinkler work associated w/tenant fit out, as per plans submitted herewith. No change to use, egress or occupancy.
Modification of Sprinkler System as shown on plans
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Minor interior partition changes as per plans. no change to use, egress or occupancy filed under this application.
This alt gc application is being filed for the tenant fit-out of an existing retail space in a high rise office building. work includes new shuttle lula elevator and convenience st…
General construction including renovation of an existing accessory pantry located on accessory terrace. No change in use, egress, or occupancy.
Hereby filing to install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Modifications to existing plumbing and sprinkler systems in 7th floor commercial office space. no change to use, occupancy or egress
Sprinkler work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Plumbing work on the 10th floor (Ramboll) as indicated on drawings.
Installation of a temporarily Plywood Enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli…
Construction of new access stair, louvered screen and railing on elevated steel platform on upper and lower levels.new grating on lower level of tank platform and new grating on up…
Modifications to the existing plumbing system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Plumbing modifications taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.