1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Mechanical work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. install hvac units & associated ductwork. install new condensers on roof. install…
Renovate existing apartment ph12 on the 12th floor. demo and construct non bearing interior partitions, cabinetry and finishes. no change to use, egress or occupancy. mechanical, p…
Plumbing modifications for 16th floor commercial space
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Plumbing work on the 53rd floor (MGG Expansion) as indicated on drawings.
Structural modifications to take place on the cellar, first floor, and second floor as per plans filed herewith. No change in use, egress, or occupancy.
The scope of work consists of repairing loose and missing veneer components of the building envelope. No change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Plumbing work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. install plumbing fixures and associated piping. no change to use, egress or occupan…
Update the gas fired cooking equipment and fire suppression shut off on 1st floor as shown in drawings. there is no change in use, occupancy or egress under this application.
Modifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Installation and modification of plumbing fixtures as per plans.
Provide 1 new DOAS terminal unit and associated ductwork and piping and controls. Relocate 4 existing DOAS terminal units and provide new ductwork distribute to accommodate new lay…
Sprinkler work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. modify existing sprinkler system for new apartment layout. install sprinkler heads…
Installation and use of temporary sidewalk shed as per plans filed herewith. no change to use, egress or occupancy under this application.
Mechanical work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Proposed to add (1) sink on each 3rd and 4th floors. No changes to use, occupancy, or use.