1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
Plumbing work in the cellar (concourse marketing floor), 1st and 2nd floor as plans filed herewith. no change in use, egress, or occupancy.
B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupa…
General Construction to take place on the cellar, first floor, and first floor mezzanine as per drawings filed herewith. No change in use, egress, or occupancy.
Mechanical modifications to take place on the first floor as per plans filed herewith. No change in use, egress, or occupancy.
Renovation of store at 1st floor and cellar level as well as provision of new equipment platform on the third floor.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Feldman Econ: Modification of HVAC Equipment and Ductworks to accommodate installation of a new waterside economizer as indicated on plans filed herewith. No change to use, egress…
Interior demolition/partition work to be done on existing 11th floor of12 story commercial building. no lighting, mechanical, or plumbing to bedone under this application.no change…
Installation of temporary pipe scaffold as per plan as per plan. no change in use, egress or occupancy.
Installation of temporary roof protection netting as per plan. no change in use, egress or occupancy.
Structural modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy Bridgewater Terrace
Modifications to the existing plumbing fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Fit goodman ac: modification of hvac equipment and ductwork to accommodate alterations within the existing building as per plans. no change to use, egress or occupancy.
Propose new illuminated signages for existing commercial space. no chnafge to use, egess or occupancy.
Hotel Lobby Renovation
Create a new floor opening only between 4th and 5th floor in conjunction with job #m01359221. no change in use egress or occupancy
Hotel lobby renovation includes demolition of existing non loading bearing partitions. a new hotel lobby office and public restrooms, new finishes will be provided.
New mechanical exhaust system for proposed 3rd floor beauty salon atexisting commercial unit. existing use group 6. no change in use,occupancy or egress.
Application filed for plumbing modifications/additions on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.