1,616 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,616 permits
Structural work related to the replacement of one (1) new cooling tower and filtration system. no change to use, egress, or occupancy.
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
Subsequent application filed for sprinkler modifications/additions on the 7th fl (suite 706) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for plumbing additions/modifications on the 7th floor as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing and Sprinkler work being filed on the 6th floor. No change to use, egress or occupancy.
Modifications to existing plumbing and sprinkler systems in 7th floor commercial office space. no change to use, occupancy or egress
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Construction work on the 10th floor (LB Pharma expansion) as indicated on drawings.
Hereby filing to construct new interior partitions, ceilings and doors for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use egress or occupancy. we shall comply with chpater 33 of 2022 b.c
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Modification of Plumbing and related piping as shown on plans.
Bathroom and kitchen plumbing work in conjunction with dob application number 140921395.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th floor (suite 1103) as per plans filed herewith. no change in use, egres…
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 5th floor (suite 503 & 504) as per plans filed herewith. no change in use, e…
Removal of chilled water equipment, piping, etc replacing with new VRF mechanical equipment. Adjusting & balancing diffusers, ductwork is to remain.
Hereby filing to install new ac units with associated ductwork and piping for office renovation as shown on plans filed herewith. no change to use, occupancy or egress.