1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Mechanical modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy
Filing to modify Sprinkler system at 26th floor office space as per plans. No change in use, egress, or occupancy under this application.
Hereby filing alt 1 to reflect accessory office on 16,17 & 18 floor and update the total number of rooms.
Modification of plumbing fixtures for new pantry on 5th floor as per plans. no change in use, egress or occupancy.
General construction modifications includes on the 5th floor as per plans filed herewith. No change in use, egress, or occupancy.
Filing for facade repairs, work includes re-pointing of deteriorated areas of mortar joints between brick masonry & camelback tiles units. all as per plans filed herewith. no chang…
Retail 2 - Structural work for lowering of floor slab, with replaced beams, framing and infilling .
Extension of passanger elevator #4 with two additional stops: oneat the 17th fl (construction) and one at the roof level. newassociated emr and access stairs. new vestibule and toi…
General Construction taking place on the 1st Floor as per plans filed herewith. No change in Use, Egress, or Occupancy.
Install HVAC unit for chase bank.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Herewith filing a tenant fit out for Chase Bank. No change to use, egress or occupancy.
Installation of interior non-bearing partitions as per plans filed herewith. No change in use, egress, or occupancy.
Interior mechanical work in the restrooms on the 4th floor. No change in use, egress, or occupancy.
RETAIL 2 - General Construction removal and installation Floor, ceilings and partition work as per plans
Application file to interior renovation as install plumbing fixtures, grease trap, sink, exist. 02 pcs two bathroom remain at 1st & mezzanine floor for haagen-dazs ice cream store…
Installation of suspended scaffold
Mechanical work as shown on plans.
Install new AC units, ductwork related to new mechanical system on 11th floor as per plans. No change in use, egress or occupancy.
Herewith filing to modify the plumbing and sprinkler fixtures. No change to use, egress, or occupancy.