Limited facade repairs as per plans; no change to use, egress, or occupancy.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Application file to interior renovation as install plumbing fixtures, grease trap, sink, exist. 02 pcs two bathroom remain at 1st & mezzanine floor for haagen-dazs ice cream store…
Interior mechanical work in the restrooms on the 4th floor. No change in use, egress, or occupancy.
Installation of interior non-bearing partitions as per plans filed herewith. No change in use, egress, or occupancy.
Herewith filing to modify the plumbing and sprinkler fixtures. No change to use, egress, or occupancy.
Herewith filing a tenant fit out for Chase Bank. No change to use, egress or occupancy.
Install HVAC unit for chase bank.
Install new AC units, ductwork related to new mechanical system on 11th floor as per plans. No change in use, egress or occupancy.
Installation of suspended scaffold
RETAIL 2 - General Construction removal and installation Floor, ceilings and partition work as per plans
Mechanical work as shown on plans.
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
sidewalk shed installed per plans, no change in use, egress or occupancy
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of temporary plywood enclosure & barricade as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.
Install new gas piping and gas meter for replacement gas/oil burner on existing low pressure boiler. no change in use, egress or occupancy.