1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
General construction on the 3rd floor as plans filed for herewith. no change in use, egress, or occupancy.
sidewalk shed installed per plans, no change in use, egress or occupancy
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Install new gas piping and gas meter for replacement gas/oil burner on existing low pressure boiler. no change in use, egress or occupancy.
Mechanical work from the 56th to the 58th floor as plans filed herewith. No change in use, egress or occupancy.
Exterior repair as per plans filed herewith, no change to use, egress or occupancy.
Application is filed for interior renovation of non-load bearing partitions and finishes for new bathrooms, mech./storage rooms & corridors on the partial 2nd & 3rd floors as per p…
Structural Framing work to enlarge existing elevated water tank platform on roof for new water tanks as shown on plan set filed herewith. No change in use, egress, or occupancy und…
Interior renovation of existing commercial space including layout modifications, plumbing, electrical, lighting, commercial kitchen hood, storefront replacement and new convenience…
Mechanical modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Installation of (2) 15 ton ac units and associated ductwork on 5th floor as per plans. no change in use, egress or occupancy.
Interior partitions, drop ceiling, doors & frames including general carpentry work on 5th floor as per plans. no change in use, egress or occupancy.
Installation of sidewalk shed for pedestrian safety during construction. sidewalk shed shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Facade repairs, scaffold inspections, 3 men letter
General Construction taking place on the 38th and 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Removal and installation of partitions, ceiligs, doors and finishes as shown on drawings. no change to use, egress or occupancy.
Equipment use: single 7000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app…
Remove and cap plumbing fixtures as per plans