1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Structural Framing work to enlarge existing elevated water tank platform on roof for new water tanks as shown on plan set filed herewith. No change in use, egress, or occupancy und…
Installation of plumbing fixtures for the 6th and 7th floors. No change of use, egress, or occupancy under this application.
Interior partitions, drop ceiling, doors & frames including general carpentry work on 5th floor as per plans. no change in use, egress or occupancy.
General construction on the cellar (concourse marketing floor), 1st and 2nd floors as plans filed for herewith. no change in use, egress, or occupancy.
Equipment use: single 7000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app…
General Construction taking place on the 38th and 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Remove and cap plumbing fixtures as per plans
Installation of (2) 15 ton ac units and associated ductwork on 5th floor as per plans. no change in use, egress or occupancy.
Installation of sidewalk shed for pedestrian safety during construction. sidewalk shed shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Modification to existing mechaical system, ductwork, and diffusers as shown on drawings no change to use, egress or occupancy.
Interior renovation of existing commercial space including layout modifications, plumbing, electrical, lighting, commercial kitchen hood, storefront replacement and new convenience…
Mechanical modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Removal and installation of partitions, ceiligs, doors and finishes as shown on drawings. no change to use, egress or occupancy.
Facade repairs, scaffold inspections, 3 men letter
Subsequent Filing for exterior plumbing work.
Interior alteration of existing commercial space, including architectural work. no change in use, occupancy, or egress under this application.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Mechanical modifications taking place on the Cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
Existing opening to be infilled with new metal deck and steel framing.
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.