1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Mechanical work as shown on plans filed herewith.
Installation of industrial rope access for facade and local law inspection
Architectural modifications for 11th floor office tenant fitout as per plans. no change to use, egress or occupancy.
Renovation of an existing commercial store U.G. 6 at the 1st floor and cellar. No change in use, egress or occupancy under this application.
Installation of sidewalk shed for pedestrian safety during construction. sidewalk shed shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Plumbing work as shown on plans filed herewith.
Mechanical work
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Construction work on the 17th through 22nd floor (AMC) as indicated on drawings.
Sprinkler work as shown on plans filed herewith.
Modification to existing structural system on cellar and 1st floors as per plans filed. No change in use, egress or occupancy.
Filed herewith installation of plumbing fixtures and associated piping. No change of use, occupancy or egress under this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Mechanical work on the 17th through 22nd floor (AMC) as indicated on drawings.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application being filed for removal and installation of non load bearing partitions.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Filing herewith facade repairs as per plans.
Installation of temporary suspended scaffold equipment.